Cast in Situ Piles in Dhaka - An Overview
As witnessed from the determine under, steady auger is used to drill the borehole, raise up drilled soil, and pour concrete though the auger is moved up. Because of this, the borehole will not need casing or hydrostatic pressure to prevent harm to the borehole wall.It is usually suited to locations the place it can be economically feasible to use a